Products

  • 0
  • 0

Global Foam Lightweight market trend 2023-2028 Construction Precautions for Foam Lightweight Soil by Newsmapachili

Since the beginning of this year, people around the world have felt the pressure of rising prices. Not only the rise in oil prices but also different industries have seen soaring prices. According to the latest data, from August 2021 to the present, the inflation rate in the United States has risen for 6 consecutive months, and this data has soared from the previous 5.3% to 7.9% today. Inflation in the United States, the global Many countries have been affected.
According to experts' forecasts, the inflation rate in the United States may exceed 10% this year, which will face the danger of collapse, which has a great impact on global inflation, including Foam Lightweight.


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


U.S. oil prices surged about 10% to $105.14 a barrel. This is the highest level since 2014. The world benchmark Brent stock futures oil price soared by about 8% to $105.40 per barrel. The most direct rise in crude oil is inflation. The rise in oil prices means that people's food, clothing, housing, Foam Lightweight also fluctuates. If you want to know the Foam Lightweight, please feel free to contact us.

Inquery us

Our Latest Products

Global Aluminum Nitride AlN Powder,Overview of Aluminum Nitride AlN Powder,Application of Aluminum Nitride AlN Powder,Aluminum Nitride AlN Powder Price,Aluminum Nitride AlN Powder Supplier market trend 2024-2030 What are the properties of aluminum nitride

Aluminum nitride is an atomic crystal, belonging to diamond-like nitride, hexagonal, wurtzite crystal structure, non-toxic, white or off-white. Aluminum nitride is a good thermal shock material.…

Global silicon carbide powder market trend 2025-2030 What can Silicon Carbide Devices Bring to New Energy Vehicles? by Newselite-visa

US President recently decided to invoke a Cold War-era defense law to encourage domestic silicon carbide powder. What is Silicon Carbide SiC?Silicon carbide (SiC) is a hard compound containing silicon and carbon. A semiconductor, it is fo…

Global zinc stearate emulsion market trend 2022-2026 What is Zinc Stearate Emulsion Used For? by Newselite-visa

U.S. natural gas futures rose about 5 percent to a near nine-week high as global energy prices surged on concerns over a pricing plan for energy exports, keeping U.S. LNG export demand near record highs. U.S. natural gas prices have risen despite for…